The water valve chamber is occupying nearly 30% of the road width, and vendors are using this space to park their vehicles, which is causing severe traffic congestion during evening hours.
Additionally, this structure will become a major obstruction in the future when road widening or expansion works are planned. We request the concerned authorities to inspect the issue and take necessary action to relocate or redesign the valve chamber and prevent unauthorized vehicle parking in this area.
1. The rainwater canal from Road No. 10 to the STP has been improperly cleaned, with mud and stones left scattered on the road after the cleaning work.
2. The rainwater canal cover was damaged during the water pipeline laying work carried out by HMWS at the junction of Road No. 11 and Road No. 13. This has become a serious safety hazard for commuters, especially during rainy days when water logging reaches 3–4 feet, making the damaged portion completely invisible and increasing the risk of accidents.